WEDNESDAY AGGREGATE: Rate-Design Timetable, Local RA Shortfalls, EE Revisions
California’s new electric rate-design proceeding (R.26-04-009) now has a timetable, with data-center tariffs scheduled for a proposed decision in Q2 2027.
Also in today's roundup: PG&E and SCE report unfilled local resource-adequacy needs, with PG&E planning to defer procurement in six areas to CAISO backstop mechanisms. And a draft CPUC resolution would increase credited savings for selected energy efficiency projects while reducing them for certain water-heating measures.