August 13, 2026 CPUC Voting Meeting Results

At its August 13 voting meeting, the CPUC approved a broad slate of utility measures, including a $22 million PG&E wildfire settlement, a $1 billion increase in PG&E's borrowing authority and new customer-level reliability reporting requirements for PG&E, SCE, and SDG&E.

The Commission also allowed PG&E to withdraw its application for a $93.5 million Hinkley Compressor Station project, revised SoCalGas procurement rules, and streamlined oversight of Low Carbon Fuel Standard programs.

But it once again delayed action on:

  • PG&E’s attempt to exclude approximately $2.6 billion in wildfire liabilities and state borrowing from its capital-structure calculation (which now involves competing PDs); and
  • PG&E's agreement to energize Google’s 250-MW San Jose data center.

Those PG&E items are now tentatively scheduled for consideration on September 3.


ELECTRIC RELIABILITY

A decision requires PG&E, SCE and SDG&E to use a unified template for reporting customer-level distribution reliability beginning in 2027. Each utility must submit an annual report to the CPUC's Safety Policy Division within 30 days after July 15, incorporating its existing Annual Electric Reliability Report. The filing will be resolved through a staff resolution presented to the Commission for a vote.

Updated data will follow as compliance filings each October 15, January 15 and April 15. The utilities will hold an implementation workshop within 90 days after July 15, 2027, and can propose narrowly tailored revisions beginning in 2029 and every three years thereafter. The requirements (and the existing Annual Electric Reliability Report) will terminate August 15, 2036, and the rulemaking will close.

The template pairs narrative reporting with customer-, notification- and outage-level data tables. It requires utilities to

  • Identify outage causes and duration;
  • Distinguish planned, unplanned, Public Safety Power Shutoff and Fast-Trip outages;
  • Describe communications before, during and after outages; and
  • Report outreach to public safety partners and customers with medical needs.

Reports must also capture each affected customer’s access-and-functional-needs, Medical Baseline and essential-customer designations at the time of the outage. Each outage record will carry community and economic characteristics, overhead and underground circuit percentages, and conductor type. Utilities will report standard reliability metrics (CEMI, CELID, SAIDI, SAIFI, CAIDI and MAIFI, both with and without Major Event Days) sortable by income and geography.

The utilities must also explain whether changes in Fast-Trip settings contributed to repeated outages. Some customer-level data can be submitted under seal.

INSTANT ANALYSIS: The template gives the CPUC a more granular basis for testing whether utility investments and wildfire-mitigation programs are improving reliability. It also helps identify which customers keep experiencing repeated or prolonged outages. Linking outage histories to circuit characteristics, Fast-Trip settings and customer attributes could make the data relevant in future rate cases, wildfire proceedings and enforcement reviews.

The decision sets no new reliability standards or consequences for poor performance; its immediate effect is informational. Because some granular data can remain confidential and the public report is annual, public-facing analysis can lag outage events by more than a year despite quarterly submissions to CPUC staff. But routing each annual report back to the Commission through a voted-on resolution creates a recurring public forum for challenging utility performance.


WILDFIRES

Resolution SED-13 approves a $22 million shareholder-funded settlement between the CPUC's Safety and Enforcement Division (SED) and PG&E resolving potential enforcement claims arising from the 2022 Mosquito Fire.

The fire began near PG&E's Oxbow Junction Pole in Placer County, burned approximately 76,800 acres, destroyed 78 structures, damaged 13 and caused an estimated $135.9 million in property damage. SED's investigation report noted two firefighter injuries and no fatalities. However, the Administrative Consent Order (which is the settlement instrument itself) states in its severity discussion that the fire caused no injuries or fatalities.

SED concluded that electrical arcing between a lower jumper and a switch control rod most likely provided the ignition source, although the U.S. Forest Service is responsible for determining the fire's cause. The investigation identified violations involving:

  • Overdue repairs;
  • Inadequate switch testing and conductor clearance;
  • Vegetation management;
  • Cancellation of repair work; and
  • Failure to preserve equipment as evidence.

For settlement purposes, PG&E admitted or did not contest several violations but disputed others and continued to deny fault, negligence or violations connected to the fire itself.

PG&E will pay a $21 million fine to the state General Fund within 30 days and spend up to $1 million on a third-party review of its Transmission Centralized Inspection Review Team (CIRT). SED will oversee the scope and approve the contractor. The review will examine the team's organization, documentation and compliance with General Order 95, with a report due within one year after the contractor is selected.

Unused funds will go to the General Fund. SED can pursue separate enforcement concerning the inspection-review team based on the report, but the agreement otherwise resolves all known claims arising from its Mosquito Fire investigation.

INSTANT ANALYSIS: The settlement gives the CPUC a substantial cash penalty without requiring it to prove that PG&E's violations caused the Mosquito Fire. That distinction is significant: SED found that arcing at PG&E equipment most likely created the ignition source, but PG&E admits only discrete maintenance, clearance and evidence-preservation violations. And PG&E continues to deny fault for the fire itself.

The CIRT review also leaves a potential enforcement path open beyond the $22 million settlement. Although the agreement resolves the Mosquito Fire investigation, SED can bring a separate case if the review identifies broader problems with how PG&E evaluates and cancels transmission-repair recommendations. Unlike several previous wildfire settlements, nearly all of the shareholder cost will go to the General Fund rather than system improvements.


LOW CARBON FUEL STANDARD

Resolution E-5463 approves, with modifications, PG&E, SCE and SDG&E's proposal to streamline CPUC review of programs funded by Low Carbon Fuel Standard credit revenue.

The utilities will submit new program proposals annually by January 31, after notifying Energy Division at least three months in advance and consulting their Program Advisory Councils. The resolution declines to guarantee decisions by July 31, but the CPUC will develop a standardized filing template and expand its public webpage tracking approved programs and pending advice letters.

Beginning with each program's third year, utilities can seek budget extensions through their annual September forecast filings, which can also carry minor program changes in any year. If a filing remains pending after December 31, the prior year's budget will remain in effect.

The resolution also aligns CPUC oversight with CARB's revised LCFS rules. Utilities will notify the CPUC through information-only filings when CARB changes affect revenue collection or program implementation, while continuing to comply with any more detailed CPUC requirements.

Verification costs can be paid from the type of LCFS credit proceeds being verified. And medium- and heavy-duty electrification projects can count toward the 75% equity-spending requirement if they satisfy CARB's eligibility standards. The resolution also requires standardized program-level data in the annual LCFS report and allows utilities to modify the structure of advisory-council meetings with advance notice.

INSTANT ANALYSIS: The annual filing cycle should make LCFS spending easier to track and reduce the pileup caused by utilities proposing programs throughout the year. It does not guarantee faster approvals: Energy Division rejected a firm July 31 deadline and preserved its authority to modify or reject proposals. Allowing existing budgets to remain in place while September forecast filings are pending should prevent administrative delays from interrupting ongoing programs.

The process arrives as CARB's revised rules leave the utilities with more holdback revenue and broaden the ways they may spend it, particularly on medium- and heavy-duty electrification. The resolution gives the utilities flexibility to adjust budgets and program details annually while adding earlier consultation and standardized reporting. This should give the CPUC greater visibility into a growing portfolio of LCFS-funded programs.


NATURAL GAS INFRASTRUCTURE

A decision allows PG&E to withdraw its application for a $93.5 million electrical-upgrade project at the Hinkley Compressor Station. PG&E began construction January 20 under General Order 177's emergency-project exemption. It cited equipment failures and obsolescence that threatened the station's ability to maintain reliable gas supplies.

The CPUC's final decision finds that PG&E followed the exemption's filing requirements but expressly declines to determine whether the project actually qualified as an emergency. Because no certificate will be issued, the Commission also will not adopt the project's completed environmental review. However, the decision authorizes converting the final review into a Master Environmental Assessment for use in future cases.

PG&E will have to justify the project's scope and costs when it seeks ratepayer recovery. Its filing must address, at minimum:

  • Optimization of intrastate pipeline and storage capacity to meet the Peak Demand Supply Standard;
  • The station's future compression needs (justified by historical and forecast throughputs);
  • Why the electrical scope was reasonable given possible future downsizing of existing compressors;
  • The equipment and costs claimed as emergency-related under GO 177;
  • Capital and expense costs by category, MAT code and year;
  • Proposed additions to rate base; and
  • CEQA study and report expenses.

INSTANT ANALYSIS: PG&E can complete the $93.5 million project without a CPCN or any Commission finding that an emergency actually existed. The decision treats compliance with GO 177's filing steps as sufficient to close the proceeding and declines to adjudicate the validity of the emergency claim. During the proceeding, Cal Advocates argued that this was a legal error. TURN and the Small Business Utility Advocates argued instead that GO 177 itself is deficient and should be revised. The final decision rejects the legal-error claim on its merits and sets aside the GO 177 changes as beyond the scope of this proceeding.

Cost reasonableness moves to a future rate case, where PG&E must show that the project remains appropriately sized for future gas demand and identify which equipment and costs are attributable to emergency work. Cal Advocates' allegations that mismanagement increased project costs remain unresolved. The decision says these allegations may warrant investigation by the CPUC's Safety and Enforcement Division. The Commission additionally questions why funding authorized in PG&E's 2023 General Rate Case did not prevent the emergency, given that the project's first phase reportedly eliminated the immediate outage risk.


GAS SYSTEM RELIABILITY

Resolution G-3620 approves SoCalGas' gas purchases and sales to maintain minimum flows and reliability on its Southern System from October 1, 2024, through September 30, 2025.

SoCalGas completed 49 purchases costing $13.4 million, incurred $1.5 million in transportation charges and received $9.4 million from 54 sales, producing a net cost of $5.5 million. Energy Division verified the transactions, and the resolution finds that all of them complied with Gas Rule 41. SoCalGas will amortize the net cost in customer transportation rates beginning January 1, 2027, on an equal-cents-per-therm basis.

The resolution also revises Rule 41 to give SoCalGas greater procurement flexibility in a less-liquid gas market. When three competing offers are unavailable, SoCalGas can satisfy the procurement requirement by contacting at least five Southern System suppliers. The utility will have to report supplier participation and response rates and submit records documenting its outreach and market checks.

To extend the provision beyond its June 1, 2029, expiration, SoCalGas will have to demonstrate by November 1, 2028, that it improved procurement outcomes without increasing ratepayer exposure.

The resolution also revises the baseload-purchase safe harbor. The new ceiling will be 110% of the NGI Bidweek average for SoCal Border-Ehrenberg, or 110% of the broader SoCal Border Average if the Ehrenberg index is unavailable. The current benchmark is the SoCal Border Average plus 8.2 cents/Dth. That provision will expire March 31, 2028.

INSTANT ANALYSIS: The main story is the loosening of Rule 41's procurement safeguards as Southern System gas-market liquidity declines. Allowing SoCalGas to contact five suppliers when it cannot obtain three offers will preserve its ability to secure reliability supplies. But documented outreach is not the same as actual price competition, leaving less assurance that SoCalGas obtained the lowest available price. The reporting requirements and June 2029 sunset create an opportunity to test whether the fallback is being used narrowly and whether it raises costs.

The Section 19 change can also expand what SoCalGas may pay while retaining automatic reasonableness treatment, particularly when gas prices are high. It replaces a fixed 8.2-cent premium over the broader SoCal Border Average with a ceiling equal to 110% of the more localized Ehrenberg index, allowing the permitted premium to rise with the underlying gas price. The resolution concludes that the existing benchmark no longer reflects prevailing market conditions. But the change shifts more price risk to customers. Its March 2028 expiration gives the CPUC a relatively short window to evaluate that exposure before deciding whether to extend the authority.


UTILITY FINANCES

A decision grants PG&E half of its requested increase in short-term borrowing authority, raising the cap by $1 billion to $9.5 billion rather than the requested $10.5 billion. The decision finds that PG&E had not adequately tied the full increase to new financing needs. It notes that PG&E retained substantial credit capacity and relied largely on liquidity risks that were already considered when the Commission last raised its borrowing authority.

The $1 billion increase rests on PG&E's need for additional liquidity during extraordinary events, together with the CPUC's own judgment on the magnitude of those needs. The one new factor was a recently adopted 150% price cap on core procurement costs. PG&E estimated the cap would have required about $600 million in additional short-term financing over two months during the 2022-23 gas price spike, though the CPUC noted that figure could rise under the cap's three-month limit. PG&E could use the same debt instruments previously authorized, including debt secured by utility property, but the decision does not approve the costs or projects financed with the borrowing. Those projects remain subject to later reasonableness reviews.

INSTANT ANALYSIS: The decision preserves a flexible standard for utility borrowing requests while requiring PG&E to identify new or materially changed liquidity needs. The new price cap distinguished this request from the Commission's last increase and, combined with PG&E's recent usage and the CPUC's discretion, supported $1 billion. But PG&E's rate-base growth, comparisons with SCE and claims of potential credit benefits did not support the full $2 billion. Any renewed bid for the remaining authority will need more specific evidence of increased debt usage, changed financing conditions or additional liquidity exposure.


ARREARAGES

A decision requires PG&E, SCE, SDG&E and SoCalGas to continue offering their Arrearage Management Payment (AMP) plans to eligible residential customers until February 1, 2027. This extends the program beyond its current October 1, 2026, sunset date. The decision finds that the four-month extension will prevent customer confusion and operational disruption while the CPUC considers whether to continue or modify the program through a later Phase 2 decision.

The extension, the decision finds, will also align AMP's expiration with that of the Percentage of Income Payment Plan (PIPP) pilot.

INSTANT ANALYSIS: The decision preserves the status quo for four months rather than settling the larger dispute over AMP’s future. This avoids the administrative burden and customer confusion of ending the program only to restart it, while protecting continued access for customers who otherwise might face disconnection.

The extension also postpones decisions about AMP's design, effectiveness and costs. Aligning its sunset with the PIPP pilot could let the CPUC weigh its arrearage-assistance programs together. But it sets a February 1 decision point for completing the Phase 2 review, granting another extension, or making the program permanent.


HYDROELECTRIC ASSETS

A decision authorizes SCE to sell the 2.5-MW Lower Tule Hydroelectric Plant in Tulare County to Lower Tule Hydro. The century-old plant has been offline since 2017 because of wildfire damage and would require substantial refurbishment. SCE will pay the buyer an estimated $6.268 million to assume the facility, producing a $25.1 million pre-tax loss.

The CPUC nevertheless finds the sale to be the least-cost option, with an estimated customer cost of $40.2 million, compared with $57.6 million for decommissioning or $101.8 million for repairing and continuing to operate the plant. The transaction will remain contingent on FERC approval and on the buyer executing a separate agreement to purchase SCE's Kaweah hydroelectric facilities.

SCE will recover the $25.1 million loss and remaining regulatory assets from bundled and non-exempt departing-load customers through the Portfolio Allocation Balancing Account. It will also reduce the account for rate-base and maintenance costs eliminated by the sale and could include related deferred taxes in rate base until timing differences unwind.

Within 60 days after closing, SCE must submit final financial calculations through a Tier 1 advice letter. The decision denies without prejudice SCE's request to add buyer interest to the transfer payment, citing a lack of supporting information, which is one reason the $6.268 million remains an estimate. A related charge for leased Ethernet service to the plant's required remote terminal unit stands, to be finalized in the closing advice letter.

INSTANT ANALYSIS: The sale crystallizes a $25.1 million loss for customers and requires SCE to pay another company to take the plant. Still, the relevant comparison is not the project's book value but the cost of the alternatives. On SCE's estimates, selling Lower Tule saves customers $17.4 million compared with decommissioning it, and $61.6 million compared with restoring operations.

The decision also limits SCE's ability to increase the transfer payment without documentation. Its rejection of unsupported interest costs preserves scrutiny over a transaction already conditioned on a separate Kaweah sale. Final customer costs remain uncertain, pending four steps: execution of the Kaweah agreement, FERC approval of the license transfer, closing of the Lower Tule sale and SCE's closing calculations.


CORPORATE RESTRUCTURING

A decision authorizes SoCalGas and SDG&E to create Sempra California LLC as an intermediate holding company between Sempra and the utilities' existing parent companies, Enova Corporation and Pacific Enterprises.

The decision exempts the internal reorganization from Public Utilities Code Section 854(a)–(d) review under Section 853(b). It finds that Sempra will retain ultimate ownership and that the transaction will not change utility rates, service, operations, management, workforce or regulatory obligations.

The decision finds no material adverse effects on environmental and social justice communities and deems the transaction operationally neutral toward ESJ Action Plan goals.

SoCalGas and SDG&E remain subject to existing affiliate-transaction and holding-company rules. They must also:

  • Maintain separate records;
  • Refrain from commingling or pledging utility assets for affiliate obligations;
  • Preserve CPUC access to information; and
  • Remain financially ring-fenced from their affiliates.

The utilities will notify the CPUC within 30 days after completing the transaction and, within 12 months after closing, report any material workforce or labor changes attributable to it. Within 60 days after closing, they will submit a Tier 2 advice letter documenting the final corporate structure and certifying compliance with the decision's conditions.

INSTANT ANALYSIS: The decision gives Sempra greater flexibility to organize its California utilities without subjecting an internal restructuring to a full change-of-control review. Although the CPUC characterizes Section 854's applicability as a "close question," the exemption confirms that inserting another holding-company layer can receive streamlined treatment when ultimate ownership and utility operations remain unchanged.

The added layer can make affiliate transactions and financial flows more difficult to trace, while Sempra's claimed administrative benefits remain unquantified. The CPUC will address that risk through ring-fencing, separate-accounting and reporting requirements. But the decision ultimately relies on existing safeguards and post-transaction oversight rather than requiring Sempra to demonstrate measurable ratepayer benefits.